anaerobic tank

英 [ˌænəˈrəʊbɪk tæŋk] 美 [ˌæneˈroʊbɪk tæŋk]

化粪池;污水厌气发酵池

医学



双语例句

  1. The anaerobic tank which is set before the UNITANK process improves nitrogen and phosphorus removal efficiency efficiently.
    由于在UNITANK工艺前端增设了厌氧池,有效提高了UNITANK工艺的脱氮除磷效果。
  2. Secondly, an initial respiration rate is calculated at the anaerobic phase operation in the bioreactor tank.
    继之,在生物反应槽之缺氧相操作中推估一初始摄氧率。
  3. A two-step anaerobic digestion process applied to the treatment of primary sludge was investigated in continuously stirred tank reactors ( CSTR).
    实验通过运行连续搅拌反应器(CSTR),对城市初级污泥的两步嗜热厌氧消化进行了研究。
  4. Study on Bacteria-screening for the Treatment of Rural Wastewater with Triple-vessel Anaerobic Oxidation Tank and Its Best Condition
    三格厌氧氧化槽处理农村生活污水的菌种筛选及条件选择
  5. Effect of Compound Microbial Preparation on Anaerobic Digestion of Nightsoil Sludge from Septic Tank
    复合微生物制剂对化粪池污泥厌氧消化效果的影响
  6. In reversed A2/ O process an anaerobic tank is put before anoxic tank and design dividual point infall in aerobic tank after anoxic tank.
    在充分分析传统A2/O工艺的基础上,提出了将缺氧池置于厌氧池前面,厌氧池后设置好氧池的分点进水倒置A2/O工艺。
  7. Allure-type wastewater treatment technology is composed of anaerobic technology and aerobic technology, allure-type wastewater treatment equipment is made up of ABR, biological contact oxidizing tank and sedimentary tank.
    廊道式污水处理技术是厌氧技术与好氧技术的组合,廊道式污水处理设备主要由挡板式厌氧反应器和生物接触氧化池组成。
  8. Through study on the influencing factors in coking waste water treatment process, AAO waste water treatment process is optimized, the anaerobic tank has been modified.
    通过对焦化污水处理过程影响因素的研究,优化了AAO污水处理工艺,对厌氧池进行了改造。
  9. The process of anaerobic baffled tank biological contact oxidation coagulating precipitation sand filter was selected to treat towel printing and dyeing wastewater in light of the characteristics of wastewater quality.
    根据毛巾印染废水水质特点,选择了厌氧折流板反应池生物接触氧化池混凝沉淀砂滤处理工艺。
  10. After aerobic sludge sedimented in anaerobic sedimentation tank, water content in sludge lowered and total sludge quantity was decreased.
    好氧污泥在厌氧沉淀池沉淀后,降低了污泥含水率,减少污泥总量。
  11. It was in order to improve the capability retaining sludge in the anaerobic digestion tank with inclined blade settlers in this pilot sewage treatment system.
    试验池将斜板作为厌氧消化单元的填料以提高装置截留污泥的能力。
  12. A Study of Pre-Treatment of Garbage Percolate with Anaerobic Biological Filter Tank
    缺氧生物滤池预处理垃圾渗滤液的研究
  13. The modified DE oxidation ditch was adopted in Xindu Jinhai Wastewater Treatment Plant, that is, an anoxic tank and an anaerobic tank were set up in front of DE oxidation ditch for enhancing the phosphorus removal.
    四川新都金海污水处理厂采用改良型DE氧化沟工艺,即在DE型氧化沟前加设缺氧池和厌氧池以强化除磷。
  14. Based on the lab-scale experiment, the pilot-scale anaerobic fermentations for 1,3-propanediol production are carried in a lm~ 3 fermentation tank.
    在小试研究的基础上,完成了1m~3发酵罐规模的厌氧批式流加发酵法生产1,3-丙二醇中试试验。
  15. Without building new biochemical reaction tank and adding new sludge return system, anoxic/ anaerobic/ aerobic zones are set up in the existing biochemical reaction tank by improving MLSS.
    在没有新建生化反应池和增加回流系统的前提下,通过提高活性污泥浓度,在原生化反应池内进行了缺氧/厌氧/好氧功能区的分配,取得了良好的脱氮除磷效果。
  16. In this article, inside-electrolytic method was used as the pretreatment, anaerobic baffled reactor ( ABR) and aeration tank as the following biological treatment to treat methyl chlorides wastewater. The results showed that this new technological process was feasible.
    以内电解+石灰沉磷为预处理、以厌氧折流板(ABR)+普通好氧曝气为生化处理的新工艺处理甲基氯化物废水是可行的。
  17. Research on Anaerobic Treatment of Domestic Sewage In Septic Tank
    厌氧滤池处理生活污水生产试验研究
  18. Pilot Study on Sewage Wastewater Treatment by Anaerobic Septic Tank with Inclined Blade Settlers
    斜板厌氧生活污水处理池试验研究
  19. At first, the sludge of a municipal effluent treatment plant was added to hydrolytic acidification tank, anaerobic biological contact tank and biological contact oxidation tank at the same time, cultivation and membrane forming was accomplished separately in each tank.
    首先,同时向水解酸化池、接触厌氧池和生物接触氧化池投加相同成分的某城市污水厂污泥,各池独立完成培菌和挂膜过程。
  20. In this paper, a physical model of anaerobic tank section has been established in A2/ O treatment process of a sewage treatment plant. The numerical simulation and experimental methods were carried out for systematic study.
    本文以某污水处理厂的A~2/O处理工艺为蓝本,建立了厌氧池段水力搅拌的物理模型,采用数值模拟和实验方法两种研究手段分别进行了系统的研究。
  21. Construction of the Central Plains anaerobic tank sealing performance is not good, affected the growth of anaerobic microorganisms; no sludge return system.
    施工中原厌氧池密封性能不好,厌氧微生物生长受到影响;无污泥回流系统。
  22. There was a small amount of black flocculent sludge in the upper part and most of dark granular sludge in the anaerobic tank.
    厌氧槽内的厌氧污泥上部有少量絮状污泥,颜色呈黑色,大部分为颗粒状污泥,颜色呈深黑色。